Wind farms are developed in line with various technical criteria and regulatory obligations. The lead-time, which depends on a number of factors, is estimated at 21 months.
Image de Creation of a wind farm

Technical

Image de Technical et Creation of a wind farm
Wind measurement
 
Setting up of a measurement mast to determine the quality of the wind resource (average of at least 24 kmph required 50 meters above ground level).
 
Proximity to an electrical station
 
Possibility for connecting up to the public electricity network or an extra high-voltage (EHV) line.
 
Site availability
 
Possibility to use, acquire or lease sites.
 
Town planning rules
 
Checking of the project’s compatibility with the land use plan.
 
Impact analysis
 
Etudes environnementales et évaluation des différentes Environmental studies and evaluation of the various constraints and encumbrances (e.g. project's impact for civil and military aviation).
 
Building permit
 
Issued by the Prefect, after consulting with the State departments (DDE, DIREN, DDAF, DDASS, etc.) and the regional commission for sites and landscapes.

Environment

A farm's success depends on the quality of its landscape and environmental integration, as well as backing from neighboring populations and the region's various players:
 
 Landscape studies
 
Visualization of the turbines’ integration into their site: built-up areas, relief, vegetation, etc.
 
Acoustic studies
 
Simulations depending on the type of wind generators. At more than 400 meters, the noise made by a wind turbine is comparable to a conversation in a low voice.
 
Respect for sites
 
Listed or protected sites, historical monuments, Natura 2000 areas, etc.
 
Inhabitant comfort
 
Distance from homes, with distances determined by acoustic studies
 
Location
 
Site enabling accessibility to the wind turbines.
 
Flora and fauna
 
Inventory of species, compatibility research during work and operations, work with specialized associations (Ligue de Protection des Oiseaux, etc.).
 
Agricultural land
 
Location researched so as to not interfere with agricultural work